Assess. Install. Operate. / Kenya & Africa

A better water system starts on site.

Build the deployment around your pipework, flow patterns and operating team. MajiSure starts with a site assessment, then works through hardware selection, a practical pilot and commissioning before a wider rollout.

Discuss your project
MajiSure / Connected water
Smart meter installation
  1. 01Audit the site and agree the project scope
  2. 02Design and validate a representative pilot
  3. 03Install, test and map each connection
  4. 04Train operators and review early performance

Start with the real challenge

Make the operating
picture clearer.

Meter size alone is not a deployment plan. Access, water conditions, coverage, account mapping and installation procedures affect whether the system produces useful readings and a dependable operating workflow.

What the service supports

01

Select equipment for the actual site

Assess pipe sizes, expected flow, water conditions, power and communications. Confirm relevant supplier evidence and installation requirements for the selected models.

02

Prove the workflow in a pilot

Test readings, accounts, alerts and supported controls on a representative part of the site. Resolve practical issues before committing to a full rollout.

03

Commission with your operators

Check installation records and meter-to-account mapping. Train the team to handle readings, exceptions, customer questions and maintenance responsibilities.

Prepare for your audit

A useful conversation
starts with your site.

Bring a site layout, connection count, pipe information, available supply readings and your current billing process. Access arrangements and any planned construction work help define a realistic rollout sequence.

Good questions. Clear answers.

Before you begin.

Can an existing property be upgraded?

A site audit establishes suitable meter positions, access and any pipe modifications required. A phased rollout can then be planned around the building or network’s operations.

How long does installation take?

The schedule depends on connection count, site access, pipe modifications and pilot findings. The team confirms the work sequence and expected interruptions after assessment.

What does a deployment cost?

Pricing is scoped around the selected hardware, number of connections, installation work, integrations and ongoing support. Request a site-specific proposal rather than treating a calculator or example as a quotation.

Built around real places

Explore your application.

Read our practical guides

Your site. A practical next step.

Let’s make water
work better.

Tell us about your property, connections and current setup. Start with an operational audit and a proposal grounded in your site.

Book an operational audit